Water

  • 8" Water Service Hwy 11 North
  • 10" Water Service Hwy 138 North to South
  • 8" Water Service Hwy 11 @ Double Springs Church Rd.

Sewer

  • 18" Main Sewer Line / Mtn. Creek / 1 mile
  • Sewer Engineering complete
  • 2 Dry Sewer Crossings under Hwy 138
  • Sewer basin / capacity studies complete

Natural Gas

  • City of Monroe natural gas
  • Williams Energy gas line

Electrical

  • 3 Phase Power GA Hwy 138 / looped for redundancy
  • 230kv transmission line with redundancy

Fiber 

  • 40G > 100G
  • 64G  > 10Gx2 > 128G
  • City telecom 144ct fiber / capabilities for multiple 100Gbs circuits

Roads

  • Major Crossroads:  US 78 / GA Hwy 138 / GA Hwy 11
  • ​8 Approved Curb Cuts along GA Hwy 138
  • Traffic Studies Complete

Engineering

  • FEMA Flood Study Complete
  • 2' Photometric Study Complete
  • Mass Grade Plan Complete entire site
  • B3 Zoning / City of Monroe
  • Tax Opportunity Zone / Georgia DCA & City of Monroe